Customers
America’s Top Steel Companies Choose SketchDeck
Our competitors say they’re the best. Our customers prove it.
Having this tool in our back pocket has doubled our bidding volume compared to previous years.

Since bringing [SketchDeck] into our takeoff process, we’ve more than tripled our throughput.

Compared to spending a week on handwritten takeoffs, it’s a no-brainer.

A project that used to take me a day and a half to get done manually, I got it done in about two hours with [SketchDeck].

[SketchDeck] accelerates our entire workflow. We quickly get beam counts, column counts, and everything we need.

It’s the first software that is actually geared towards estimators in a meaningful way.

[A casino takeoff] would take me a couple days, probably three days at worst. With [SketchDeck], it took me about half a day.

What used to take (an estimator) two days to do, it does it within a few minutes.

I’m easily 50% faster now, and on my biggest job, a 600-ton project, it saved me 75% of my time...

For a large 13,000 ton project, I could get all my floor plans done with [SketchDeck] in a single day.

It’d be awful not to have [SketchDeck]. We’re relying on it now.

“Having this tool in our back pocket has doubled our bidding volume compared to previous years.”

“It's the first software that is actually geared towards estimators in a meaningful way.”
“What used to take (an estimator) two days to do, it does it within a few minutes.”
“[SketchDeck] accelerates our entire workflow. We quickly get beam counts, column counts, and everything we need.”
“Since bringing [SketchDeck] into our takeoff process, we've more than tripled our throughput.”
“[A casino takeoff] would take me a couple days, probably three days at worst. With [SketchDeck], it took me about half a day.”

“It'd be awful not to have [SketchDeck]. We're relying on it now.”
“Compared to spending a week on handwritten takeoffs, it's a no-brainer.”

“For a large 13,000 ton project, I could get all my floor plans done with [SketchDeck] in a single day.”
“I'm easily 50% faster now, and on my biggest job, a 600-ton project, it saved me 75% of my time...”

“A project that used to take me a day and a half to get done manually, I got it done in about two hours with [SketchDeck].”

Since bringing [SketchDeck] into our takeoff process, we’ve more than tripled our throughput.

Having this tool in our back pocket has doubled our bidding volume compared to previous years.

Hear it from the shops
Three fabricators talk through how their takeoffs work now.



What customers report
Each number comes from one customer’s own job. Select a number to read the quote behind it.
- 2xbid volume pace this yearDennis Scheibe, National Steel City
- ½ daydown from 2–3 days on a casino takeoffJohn Gonzalez, Steel Specialties
- 3xtakeoff throughputJordan Engelking, Steelworks of the Carolinas
- 91%time reduction per sheetNathan Whitley, FabArc Steel Supply
- <5beams in a hundred need a tweakMatt Chance, NAFCO
- 75%time saved on a 600-ton jobDawn Hargraves, Maccabee Industrial
- 2 hrsfor a day-and-a-half manual takeoffTim Allen, S&H Steel
- 1 dayfor all the floor plans on a 13,000-ton jobBlake Arkwood, Ideal Contracting
- 2 daysinstead of a 4-day manual processTroy Ernst, King Steel
- 95%less time on beam takeoffsMason Carragher, MSE
Testimonials
We’re on pace to submit more proposals this year with half the staff in the estimating department. Having this tool in our back pocket has doubled our bidding volume compared to previous years.

If I got to sit on it consistently for the whole day, it’d probably take me about a couple days, probably three days at worst. With [SketchDeck], it took me about half a day.

Forty years in the business and we’re still finding new ways to work smarter. Since bringing [SketchDeck] into our takeoff process, we’ve more than tripled our throughput. What used to take us days now takes a fraction of the time, which allows our team to do more without losing the attention to detail this industry demands.

[SketchDeck] has dramatically improved both my speed and efficiency. I’m easily 50% faster now, and on my biggest job, a 600-ton project, it saved me 75% of my time. The ease of use with smart point-and-click features that guide you through each step made my speed and efficiency improve in days not weeks.

What used to take (an estimator) two days to do, it does it within a few minutes. I’ve been amazed at every step of the process.

We thought this was too good to be true, so we checked everything. If the drawing has a hundred beams on it, there’s probably less than five that I’m tweaking, a minute or two each. Compared to spending a week on handwritten takeoffs, it’s a no-brainer.

A project that used to take me a day and a half to get done manually, I got it done in about two hours with [SketchDeck]. The software saves a tremendous amount of time, especially on beam-heavy takeoffs.

On floor plans with typical beam plans, there’s no question. [SketchDeck] saves huge amounts of time and gives us a big advantage over competitors. For a large 13,000 ton project, I could get all my floor plans done with [SketchDeck] in a single day.

[SketchDeck] accelerates our entire workflow. We quickly get beam counts, column counts, and everything we need.

It’d be awful not to have [SketchDeck]. We’re relying on it now.

It’s the first software that is actually geared towards estimators in a meaningful way.

[SketchDeck] has completely changed how we do our takeoffs. We went from doing beam takeoffs by hand to having the computer do it automatically.
Our technology investments must deliver great ROI, and [SketchDeck] consistently adds value to our team.

The support from the SketchDeck AI team is great. Whenever we have questions, we just send an email and we get assistance within hours.

Our real champion is the variance in the EOR’s BOM. We were within 0.3% on a 40,000-ton project, within 50 pieces or something like that. That was pretty powerful.

My dad is the most old-school, pen-and-paper guy on the planet. He was the most skeptical about this program even working, and the cost of it. But once we got that project, all that doubt went away.

[SketchDeck] has more than tripled our throughput and completely transformed how we work. The software handles all the tedious manual work on large jobs with thousands of beams, allowing our team to focus on the critical aspects while maintaining accuracy.

We can now take on projects that would have been impossible to complete manually within the bid timeline. It’s opened up entirely new opportunities for us.

What would have taken me four to five days as a manual takeoff, with [SketchDeck], I’m able to complete the takeoff in two days.

[SketchDeck] buzzes through the plans really well. I can probably do six or seven plans in a day with [SketchDeck]. For simple building plans, I’m moving maybe four or five times faster than before.

[SketchDeck] has changed our approach to large-scale projects. On a recent 15-16 story project, [SketchDeck] automated what would have taken a half-day of manual stud counting.

The beam counts are spectacular!

[SketchDeck] is constantly improving its ability to read more complex technical drawings. The software can filter out unnecessary information and accurately identify beams and columns, so we only need minimal cleanup. As a result, we make fewer mistakes and complete our work more quickly.
The partnership with [SketchDeck] has been valuable. Our input has directly shaped how the product works, creating a solution that fits perfectly with our work requirements and continues to grow in ability. This partnership ensures we continue to build that value and enhance our competitiveness in a competitive market.

I’d just tell them to do it. It’s paid for itself.

I would describe it as a structural item locator. It’s going to look for the shapes that we all recognize, W’s, HSS. It’s not going to guess for you. It’s just going to give you what’s on there, and you still get that ability to look it over.

[SketchDeck] helps our team work faster on big projects. The software gives us more time to review pricing and proposals with fewer estimators. It allows us to keep overhead low as we go after larger, more competitive jobs.

We are pen and paper people. We open the drawing, find that W8x10, see that it’s 10 feet long, and mark it off. We’re literally going from 1980 to 2025. That’s a 50-year technology jump.

The scalability advantage is remarkable. As project complexity increases, [SketchDeck]’s value grows exponentially.

The takeoff is a tedious part of the estimating process and we don’t want to waste more time than necessary on that work. We want to minimize it to provide more time to plan the most efficient way to build the job. [SketchDeck] is an extremely helpful tool in helping us accomplish this goal.

Because of SketchDeck, we were actually able to hire a guy. He’s young, he’s going to be able to pick it up because he’s using a program. Thanks to him and SketchDeck, we got a million-dollar project.

[SketchDeck]’s detection accuracy consistently meets our needs while eliminating hours of error-prone manual calculations.

It brought us back from a point of feeling a little hopeless and a little stressed out about work to, now we got a lot of work.

The column schedule detection capabilities are accurate and constantly improving.












