NewAddressing the Material Availability Crisis with SketchDeck 3.0Read the post

Meet SketchDeck 3.0

Rebuilt from the ground up to help fabricators and erectors make material and commercial decisions earlier.

Steel demand is through the roof, and material availability is the new bottleneck. SketchDeck 3.0 pairs the #1 model for structural steel with more of each job in one place, so your takeoff gets you to decisions sooner.

Trusted by 500+ estimators at the top fabricators in North America
SSE Steel FabricationSteelFabMetals Fabrication CompanyBerlin SteelMSECollins SteelFabArc SteelSC SteelKinsley SteelASPE South
United SteelWhitemud IronworksBuilding Envelope SystemsCyntechKing SteelNAFCOSteel DynamicsSteel LLCIdeal ContractingSteelworks of the Carolinas

Why we rebuilt it

Material availability is the new bottleneck.

  1. 01

    Steel demand is through the roof.

    A surge in data center construction and new steel tariffs have put the industry in an unprecedented position.

  2. 02

    Prices climb while a bid sits.

    Lead times keep stretching. Miss a mill allocation and the next chance to buy can be months away.

  3. 03

    Jobs sell earlier, so change orders get bigger.

    Projects are committed before designs are mature, and the fabricator has to absorb the changes after award.

So we rebuilt SketchDeck from the ground up to help fabricators and erectors make material and commercial decisions earlier.

Read the full story

See SketchDeck 3.0 on your own drawings.

Book a demo

What 3.0 gives you

Accuracy, speed and control.

Accuracy

The #1 model for structural steel.

Every material decision starts with an accurate takeoff. SketchDeck finds the beams, columns and bracing, sizes and measures them, and shows what it found and what it didn't, so estimators check the takeoff instead of redoing it.

Speed

Get to quantities sooner.

Automations match revised sheets, read scales and classify sheets, so every job takes less setup. And the new platform is rebuilt to ship faster.

Control

More of each job in one place.

Connection material, markups, section links and bid tracking live with the takeoff, with roles and permissions for your team.

What's new in 3.0

Everything from the launch video, with the In Beta tools you can try now.

Connection material

Add connection material right in the takeoff. Select the members, add the plates and bolts once, and they're applied to every member you selected.

3D modeling

In Beta

See the frame in 3D, straight from your drawings. Turn your 2D takeoff into an interactive 3D model.

Column automation

In Beta

Chase a column top to bottom. The schedule sits beside the plan.

New markup tools

Count anything on the drawing. Areas, polylines, counts and notes, with quantities that update as you go.

Automations

More of the takeoff done for you. Revised sheets are matched to the originals, scales are read and sheets are classified, so setup takes less time.

Section-cut linking

Follow any callout straight to its section or detail. Read it without leaving the plan.

Page stitching

In Beta

Multi-page drawing sets in one view. Built for bigger, more complex jobs.

Improved bid management

See where every bid stands. Assign work, set due dates and control who can see and change what.

Parametric connection material

In Beta

Continuous runs, spaced items and stock-length cuts.

Send us a set and we'll run it in 3.0 on the call.

Book a demo

Plus everything you already rely on

Revision management

Catch every change in a revised set. Load the new drawings, line them up, and see what changed and by how much.

Exports

Export in your system's format. Takeoff lands in PowerFab, STRUMIS, Bluebeam or Excel without rework.

Trusted by the top fabricators in North America.

500+ estimators use SketchDeck to build hospitals, stadiums and data centers.

“[SketchDeck] has dramatically improved both my speed and efficiency. I'm easily 50% faster now, and on my biggest job, a 600-ton project, it saved me 75% of my time.”

Dawn HargravesEstimator, Maccabee Industrial

“It'd be awful not to have [SketchDeck]. We're relying on it now.”

Troy ErnstVice President of Estimating, King Steel

“What used to take (an estimator) two days to do, it does it within a few minutes. I've been amazed at every step of the process.”

Nathan WhitleyChief Estimator, FabArc Steel