NewAddressing the Material Availability Crisis with SketchDeck 3.0Read the post

SketchDeck vs Alkali

Fabricators choose SketchDeck over Alkali.

The #1 structural steel takeoff, built by and for steel people who know the industry inside and out. Shipped, and in use on live bids today.

Trusted by top fabricators and erectors in North America
National Steel CitySteelFabBerlin SteelMSECollins SteelSC SteelKinsley Steel
Steel SpecialtiesUnited SteelWhitemud IronworksBuilding Envelope SystemsCyntechKing SteelSteel DynamicsSteel LLC
See customer stories

3 Reasons Fabricators Choose SketchDeck.

The core takeoff workflows done right, the first time.

Bids go wrong on the basics: a concrete column counted as steel, hollow-core picked up as a beam. SketchDeck is trained only on structural steel and flags anything it isn't sure of.

It's a structural item locator. It's not going to guess for you.
Operations managerTexas fabricator

What you see in the demo is what you get.

Everything here is shipped and in use. More than $25B in bids has run through SketchDeck.

It'd be awful not to have [SketchDeck]. We're relying on it now.
Troy ErnstVice President of Estimating, King Steel
2 daysinstead of a 4-day manual process

Steel people built it, and steel people set you up.

Founded by a structural engineer, with 1-on-1 onboarding from former estimators.

It's the first software that is actually geared towards estimators in a meaningful way.
Mason CarragherEstimator, MSE
95%less time on beam takeoffs

SketchDeck vs Alkali, Side by Side.

SketchDeckAlkali
AI takeoffBeams, columns, braces, joists, base plates, studs, camber, piece marks, and moreBeams, columns, joists, braces, base plates
Steel weightsTonnage calculated from section weightsAISC weights built in
When it isn't sureFlags the member for your estimatorNot listed
Connections and laborFraming at each beam end, mapped to your labor codes in Tekla PowerFab, STRUMIS, Excel, and moreConnections listed
Finding detailsSection callouts open the detail in split viewSearch across the bid set
RevisionsMember by member, adds and deducts with weightChanges found, accept or reject
3D modelEstimate-level model (In Beta)3D model with every takeoff
MaterialStock-length pieces for connection material (In Beta)Nesting
Working as a teamBid tracking with roles and permissionsLive editing, share links
ExportsTekla PowerFab, STRUMIS, E.J.E., FabTrol, Excel, marked-up PDFTekla, Excel, Bluebeam, Adobe
Track record$25B+ in bids, 10 named customer results“2,500+ steel projects,” no named results
Getting startedDemo on your drawings, then 1-on-1 onboardingTry it without signing up

Alkali details from Alkali's website, November 2026.

Which One Fits You.

Alkali fits if you're a small team that wants to try a tool on your own. SketchDeck fits if you bid real tonnage and need a takeoff you can check line by line.

  • $25B+

    In bids run through SketchDeck

  • 3x

    Takeoff throughput (Steelworks of the Carolinas)

  • 0.3%

    Off the hand takeoff, 40,000-ton job (National Steel City)

Since bringing [SketchDeck] into our takeoff process, we've more than tripled our throughput.
Jordan EngelkingEstimating Manager, Steelworks of the Carolinas

See a Takeoff Go From Upload to Export in 3 Minutes.

What Our Customers Say: Days of Takeoff, Done in Hours.

See all customer stories

Got questions?

FAQ

How do I compare share-of-steel numbers?

Ask how they're counted: bid or won, tons or drawing sets, paying customers or trials.

We're looking at Alkali too. How should we compare?

Try both on the same project. Send us a bid you're working on and we'll support you through the trial.

Can I try it on my own drawings?

Yes. Send us a bid set and we'll run it with you, then set you up with a trial.

Will it work with the software I price in?

Yes. It exports to Tekla PowerFab, STRUMIS, Excel and Bluebeam, with your labor codes mapped.

How is SketchDeck priced?

Flexible options for your shop size and seats.

Run Your Next Bid Through SketchDeck and Alkali.