<?xml version="1.0" encoding="UTF-8"?><rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:sy="http://purl.org/rss/1.0/modules/syndication/">
<channel>
	<title>SketchDeck.ai Blog</title>
	<atom:link href="https://sketchdeck.ai/feed/" rel="self" type="application/rss+xml" />
	<link>https://sketchdeck.ai/</link>
	<description>Steel estimating guides, product updates and company news from the SketchDeck.ai team.</description>
	<lastBuildDate>Fri, 16 Oct 2026 12:00:00 GMT</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
		<item>
			<title>Addendum vs Bulletin vs Change Order: How Steel Estimators Handle Each One</title>
			<link>https://sketchdeck.ai/blog/addendum-vs-bulletin-vs-change-order-steel-estimating/</link>
			<dc:creator><![CDATA[matt Santos]]></dc:creator>
			<pubDate>Fri, 16 Oct 2026 12:00:00 GMT</pubDate>
			<category><![CDATA[Education]]></category>
			<guid isPermaLink="false">https://sketchdeck.ai/?p=addendum-vs-bulletin-vs-change-order-steel-estimating</guid>
			<description><![CDATA[An addendum changes the bid documents before bids are due. A bulletin changes the design after award. A change order is the signed agreement that changes scope, price, or time. Here is what each one means for a structural steel estimator, and how to price and track them.]]></description>
		</item>
		<item>
			<title>Steel Connection Types: How to Spot Them on Drawings and What to Count</title>
			<link>https://sketchdeck.ai/blog/structural-steel-connection-types-estimators-guide/</link>
			<dc:creator><![CDATA[matt Santos]]></dc:creator>
			<pubDate>Fri, 16 Oct 2026 12:00:00 GMT</pubDate>
			<category><![CDATA[Education]]></category>
			<guid isPermaLink="false">https://sketchdeck.ai/?p=structural-steel-connection-types-estimators-guide</guid>
			<description><![CDATA[Steel connections join members and transfer load from one to the next. This guide covers each common connection type, how it shows up on structural drawings, and what it adds to the takeoff in plates, angles, bolts, welds and shop labor.]]></description>
		</item>
		<item>
			<title>Addressing the Material Availability Crisis with SketchDeck 3.0</title>
			<link>https://sketchdeck.ai/blog/addressing-the-material-availability-crisis-with-sketchdeck-3-0/</link>
			<dc:creator><![CDATA[matt Santos]]></dc:creator>
			<pubDate>Thu, 15 Oct 2026 14:00:00 GMT</pubDate>
			<category><![CDATA[News]]></category>
			<category><![CDATA[Product]]></category>
			<category><![CDATA[Featured Article]]></category>
			<guid isPermaLink="false">https://sketchdeck.ai/?p=addressing-the-material-availability-crisis-with-sketchdeck-3-0</guid>
			<description><![CDATA[Material availability has become the biggest constraint for many structural steel fabricators and erectors. Here's how we rebuilt SketchDeck to help.]]></description>
		</item>
		<item>
			<title>We’re at FABTECH 2026</title>
			<link>https://sketchdeck.ai/blog/were-at-fabtech-2026/</link>
			<dc:creator><![CDATA[matt Santos]]></dc:creator>
			<pubDate>Wed, 07 Oct 2026 17:30:00 GMT</pubDate>
			<category><![CDATA[Featured Article]]></category>
			<category><![CDATA[News]]></category>
			<guid isPermaLink="false">https://sketchdeck.ai/?p=were-at-fabtech-2026</guid>
			<description><![CDATA[The SketchDeck.ai team is heading to FABTECH 2026 at the Las Vegas Convention Center, October 21-23. Stop by Booth #C7044 to meet the team and get a first look at SketchDeck 3.0, rebuilt from the ground up.]]></description>
		</item>
		<item>
			<title>Reconciling Your Takeoff with Fabrication Reality: Closing the Gap Between Estimate and Execution</title>
			<link>https://sketchdeck.ai/blog/reconciling-your-takeoff-with-fabrication-reality-closing-the-gap-between-estimate-and-execution/</link>
			<dc:creator><![CDATA[matt Santos]]></dc:creator>
			<pubDate>Fri, 04 Sep 2026 09:00:00 GMT</pubDate>
			<category><![CDATA[Education]]></category>
			<guid isPermaLink="false">https://sketchdeck.ai/?p=805</guid>
			<description><![CDATA[The steel takes shape in the shop, and the estimate meets reality. Plates that were not on the bid set. Weld types the detailer specified differently than the estimator assumed. Material substitutions driven by mill availability. Every variance between the takeoff and what actually gets fabricated is either a change order conversation, an absorbed cost, …]]></description>
		</item>
		<item>
			<title>Connection Takeoff: Where Most Errors Occur and How to Fix Them</title>
			<link>https://sketchdeck.ai/blog/connection-takeoff-where-most-errors-occur-and-how-to-fix-them/</link>
			<dc:creator><![CDATA[matt Santos]]></dc:creator>
			<pubDate>Tue, 01 Sep 2026 09:00:00 GMT</pubDate>
			<category><![CDATA[Education]]></category>
			<guid isPermaLink="false">https://sketchdeck.ai/?p=802</guid>
			<description><![CDATA[Connections are where steel bids most often go wrong. The reasons are structural: connections carry a disproportionate share of fabrication labor cost, they are scattered across the drawing set rather than concentrated on framing plans, they have more variability than any other category of steel scope, and they typically get rushed at the end of …]]></description>
		</item>
		<item>
			<title>Handling Incomplete or Ambiguous Drawings in Steel Estimating</title>
			<link>https://sketchdeck.ai/blog/handling-incomplete-or-ambiguous-drawings-in-steel-estimating/</link>
			<dc:creator><![CDATA[matt Santos]]></dc:creator>
			<pubDate>Thu, 27 Aug 2026 09:00:00 GMT</pubDate>
			<category><![CDATA[Education]]></category>
			<guid isPermaLink="false">https://sketchdeck.ai/?p=790</guid>
			<description><![CDATA[Incomplete drawings are one of the persistent realities of steel estimating. Missing dimensions. Vague connection callouts. Conflicting specifications between the drawing set and the specifications book. Notes that reference details that never made it into the drawing package. The estimator who has never dealt with an ambiguous bid set has never dealt with a real …]]></description>
		</item>
		<item>
			<title>Why Accurate Takeoffs Win More Jobs</title>
			<link>https://sketchdeck.ai/blog/why-accurate-takeoffs-win-more-jobs/</link>
			<dc:creator><![CDATA[matt Santos]]></dc:creator>
			<pubDate>Mon, 24 Aug 2026 09:00:00 GMT</pubDate>
			<category><![CDATA[Education]]></category>
			<guid isPermaLink="false">https://sketchdeck.ai/?p=785</guid>
			<description><![CDATA[Winning steel bids is not about being the lowest number. It is about delivering numbers clients trust. When estimators submit takeoffs anchored in guesswork, one of two things happens. The bid comes in too high and loses on price. Or the bid comes in too low, wins the job, and then eats the difference between …]]></description>
		</item>
		<item>
			<title>Common Steel Takeoff Errors and How to Avoid Them</title>
			<link>https://sketchdeck.ai/blog/common-steel-takeoff-errors-and-how-to-avoid-them/</link>
			<dc:creator><![CDATA[matt Santos]]></dc:creator>
			<pubDate>Fri, 21 Aug 2026 09:00:00 GMT</pubDate>
			<category><![CDATA[Education]]></category>
			<guid isPermaLink="false">https://sketchdeck.ai/?p=782</guid>
			<description><![CDATA[Steel takeoffs are the foundation of every profitable bid. They are also where the most expensive mistakes get made. A single missed connection plate, a misclassified beam, or a missed drawing revision can trigger material shortages, schedule disruptions, and margin loss that no amount of pricing skill downstream can recover. Every experienced estimator has stories …]]></description>
		</item>
		<item>
			<title>Creating Reusable Templates and Assemblies for Steel Estimation</title>
			<link>https://sketchdeck.ai/blog/creating-reusable-templates-and-assemblies-for-steel-estimation/</link>
			<dc:creator><![CDATA[matt Santos]]></dc:creator>
			<pubDate>Tue, 18 Aug 2026 09:00:00 GMT</pubDate>
			<category><![CDATA[Education]]></category>
			<guid isPermaLink="false">https://sketchdeck.ai/?p=779</guid>
			<description><![CDATA[Every steel project has recurring elements. Standard connections. Common beam-column assemblies. Typical stair details. The same base plate configurations appearing across multiple projects. Yet many estimating departments rebuild these from scratch on every bid, treating each project as though it were the first one their shop had ever seen. The redundancy is expensive. Cycle times …]]></description>
		</item>
</channel>
</rss>